Status update – 6 November

Status update – 6 November

Large scale testing continues at the top secret large scale testing site (just off Bridge Road in Hulwiz Industrial, east of the Banana for Scale!).

I have just developed a new signalling system that reacts to the direction that the train is going in, enabling priority controls where there is a two-way line without stopping the train on its way out.

There is now also a control board up, enabling the remote resetting of trains and signals, and also showing/hiding signal components.

I’m satisfied that this will work at scale and that the script work required to set up will be within acceptable frustration parameters and accessible at “tinkerer” level.

in-world snapshot of a model rrail setup
in-world snapshot of a pink haired avatar considering their build